Header menu link for other important links
X
Sediment budget for Paradip port, India
Published in
1990
Volume: 13
   
Issue: 1
Pages: 69 - 81
Abstract
A sediment budget calculation for Paradip port, situated on the east coast of India, is presented, taking into account longshore sand transport and nearshore erosion and deposition. Longshore sand transport rates have been computed using a CERC formula for which the average breaking wave characteristics, obtained from wave refraction diagrams were used. Quantities of nearshore erosion and deposition were obtained from the analysis of near-shore profiles. The study reveals that a quantity of nearly 0·8 million m3 of sand is deposited in the approach channel, while as much as 1·3 million m3 of sand is removed from the northern side of the port annually. It is also clear that the dumping of sand dredged from the port and its approaches beyond the 11 m depth contour on the northern side of the port, does not help to prevent erosion to the north of the port. © 1990.
About the journal
JournalOcean and Shoreline Management
ISSN09518312
Open AccessNo
Concepts (10)
  •  related image
    PARADIP PORT, INDIA
  •  related image
    Ports
  •  related image
    Sediment transport
  •  related image
    WAVE REFRACTION
  •  related image
    DUMPING
  •  related image
    Erosion
  •  related image
    Port
  •  related image
    Sand
  •  related image
    SEDIMENT BUDGET
  •  related image
    INDIA, PARADIP PORT