Header menu link for other important links
X
Flow shop scheduling algorithms for minimizing the completion time variance and the sum of squares of completion time deviations from a common due date
Published in
2001
Volume: 132
   
Issue: 3
Pages: 643 - 665
Abstract
We consider two problems of m-machine flow shop scheduling in this paper: one, with the objective of minimizing the variance of completion times of jobs, and the other with the objective of minimizing the sum of squares of deviations of job completion times from a common due date. Lower bounds on the sum of squares of deviations of job completion times from the mean completion time of jobs for a given partial sequence are first presented. Using these lower bounds, a branch and bound algorithm based on breadth-first search procedure for scheduling n jobs on m-machines with the objective of minimizing completion time variance (CTV) is developed to obtain the best permutation sequence. We also present two lower bounds and thereafter, a branch and bound algorithm with the objective of minimizing the sum of squares of deviations of job completion times from a given common due date (called the MSD problem). The computational experience with the working of the two proposed branch and bound algorithms is also reported. Two heuristics, one for each of the two problems, are developed. The computational experience on the evaluation of the heuristics is discussed. © 2001 Elsevier Science B.V.
About the journal
JournalEuropean Journal of Operational Research
ISSN03772217
Open AccessNo
Concepts (14)
  •  related image
    Algorithms
  •  related image
    Computational methods
  •  related image
    Heuristic methods
  •  related image
    Outsourcing
  •  related image
    Process engineering
  •  related image
    Production control
  •  related image
    Resource allocation
  •  related image
    Scheduling
  •  related image
    Statistical methods
  •  related image
    Strategic planning
  •  related image
    Branch-and-bound algorithms
  •  related image
    COMPLETION TIME VARIANCE (CTV)
  •  related image
    FLOWSHOP SCHEDULING
  •  related image
    Operations research