The DIMS methodology gives guidelines to the construction designer manager for decomposing and integrating the project design. The drawing DSM is developed through PIM DIM and DIA. These drawing dependencies are used for making decision in the drawing execution sequence. Also it is giving guidance to the designers to identify the affected parties because of the changes made in their drawings by the updated design information. The dynamic nature of this drawing DSM will also reduce the complexity in the interfaces as the design progresses.