Design interface management system (DIMS) for construction projects
Published in
2008
Pages: 169 - 182
Abstract
The DIMS methodology gives guidelines to the construction designer manager for decomposing and integrating the project design. The drawing DSM is developed through PIM DIM and DIA. These drawing dependencies are used for making decision in the drawing execution sequence. Also it is giving guidance to the designers to identify the affected parties because of the changes made in their drawings by the updated design information. The dynamic nature of this drawing DSM will also reduce the complexity in the interfaces as the design progresses.
About the journal
JournalProceedings of the 10th International DSM Conference
Open AccessNo
Concepts (15)
  •  related image
    CONSTRUCTION PROJECTS
  •  related image
    DESIGN INFORMATION
  •  related image
    DESIGN INTERFACE
  •  related image
    DESIGN PROGRESS
  •  related image
    DIMS
  •  related image
    DYNAMIC NATURE
  •  related image
    EXECUTION SEQUENCES
  •  related image
    INTERFACE MANAGEMENT
  •  related image
    MAKING DECISION
  •  related image
    PHYSICAL INTERFACE
  •  related image
    PROJECT DESIGNS
  •  related image
    Construction industry
  •  related image
    Managers
  •  related image
    Product design
  •  related image
    Project management