Coordinated preventive maintenance scheduling of GENCO and TRANSCO in restructured power systems
T. Geetha,
Published in
2009
Volume: 31
   
Issue: 10
Pages: 626 - 638
Abstract
Preventive maintenance of generating units and lines, in a competitive electric energy environment is proposed. Inclusion of transmission constraints and forced outage rates, over a specified operational period is considered. For generator maintenance the objective of the ISO is to maintain adequate level of reliability throughout the operational period, for which Bender's decomposition technique is used. The objective of the GENCO is to maximize profit or to minimize loss in profit, for which transmission constrained price based unit commitment (TCPBUC), based on Lagrangian relaxation method is used. Bender's decomposition technique is used for line maintenance, with adequate level of reliability. A coordinating technique using penalty factors is incorporated to obtain convergence of the conflicting objectives. The transmission constraints are modeled using dc sensitivity factors. Detailed case studies of six-bus systems and IEEE RTS system are presented and discussed. © 2009 Elsevier Ltd. All rights reserved.
About the journal
JournalInternational Journal of Electrical Power and Energy Systems
ISSN01420615
Open AccessNo
Concepts (8)
  •  related image
    BENDER'S DECOMPOSITION
  •  related image
    COORDINATION PENALTY FACTORS
  •  related image
    ELNS (EXPECTED LOAD NOT SERVED)
  •  related image
    Lagrangian relaxation
  •  related image
    TRANSMISSION CONSTRAINTS
  •  related image
    Lagrange multipliers
  •  related image
    Profitability
  •  related image
    Preventive maintenance