Header menu link for other important links
X
Coordinated maintenance scheduling of gencos and transcos in restructured power systems
T. Geetha,
Published in
2005
Volume: 2005
   
Pages: 213 - 220
Abstract
This paper proposes a methodology for the development of automatic scheduling techniques, for preventive maintenance of generating units and lines, in a competitive electric energy environment, with the inclusion of transmission constraints and forced outage rates, over a specified operational period. For generator maintenance the objective of the ISO is to maintain adequate level of reliability throughout the operational period (for which Bender's decomposition technique is used) and the objective of the GENCO is to maximize profit or to minimize loss in profit (for which transmission constrained price based unit commitment, TCPBUC, based on Lagrangian relaxation method is used). For line maintenance minimum cost model bender's technique with adequate level of reliability is used. A coordinating technique using penalty factors is incorporated to converge the conflicting objectives. The transmission constraints are modeled using dc sensitivity factors. Case study with a 6 bus, 3 generator, 11 line system is presented and discussed. © 2006 IEEE.
About the journal
Journal2006 IEEE Power India Conference
Open AccessNo
Concepts (14)
  •  related image
    Electric energy storage
  •  related image
    Electric loads
  •  related image
    Outages
  •  related image
    Preventive maintenance
  •  related image
    Standards
  •  related image
    BENDER'S DECOMPOSITION
  •  related image
    Coordination
  •  related image
    COORDINATION PENALTY FACTORS
  •  related image
    FORCED OUTAGE RATES
  •  related image
    LAGRANGIAN RELAXATION METHOD
  •  related image
    LOSS INDEX MATRIX
  •  related image
    RISK PENALTY FACTORS
  •  related image
    TRANSMISSION CONSTRAINTS
  •  related image
    Electric power systems