Achieving lean design using design interface management tool
Published in
2009
Pages: 533 - 542
Abstract
The design and construction on infrastructure projects were earlier done in sequence. However, the rapid rise in the infrastructure requirements and accelerated project schedules produced tremendous pressure on the construction organizations to adopt concurrent and fast-track techniques. This resulted in suboptimal utilization of resources and increased wastes to meet the schedule in the construction and design phases. Lean principles are used to plan the wastes reduction in the construction phase which was a common demand in the past. Research studies show that the design phase has more impact on the overall project planning and wastes reduction than the subsequent phases. Many methods have been devised to plan the design phases. Of these, the Design Structure Matrix (DSM) has shown a lot of application potential. This paper discusses a server based DSM tool called 'diMs' implemented on a design project to achieve lean design through managing the processes. The paper also discusses the waste reduction using 'diMs' tool compared with the conventional design practices with an example case study.
About the journal
JournalProceedings of IGLC17: 17th Annual Conference of the International Group for Lean Construction
Open AccessNo
Concepts (22)
  •  related image
    CONSTRUCTION ORGANIZATIONS
  •  related image
    CONSTRUCTION PHASE
  •  related image
    Conventional design
  •  related image
    DDSM
  •  related image
    Design and construction
  •  related image
    DESIGN INTERFACE
  •  related image
    DESIGN INTERFACE MANAGEMENT
  •  related image
    DESIGN PHASE
  •  related image
    DESIGN PHASIS
  •  related image
    Design projects
  •  related image
    DESIGN STRUCTURE MATRICES
  •  related image
    DIMS
  •  related image
    Infrastructure project
  •  related image
    LEAN PRINCIPLES
  •  related image
    PROJECT PLANNING
  •  related image
    PROJECT SCHEDULES
  •  related image
    Research studies
  •  related image
    SERVER-BASED
  •  related image
    Waste reduction
  •  related image
    Design
  •  related image
    Waste utilization
  •  related image
    Project management